Buyer guideMTC Review Checklist for Buyers: EN 10204 3.1 and 3.2 Audit
How international buyers should review a Mill Test Certificate before approving shipment, including EN 10204 3.1 vs 3.2 differences and red flags.
Insights
Technical articles, standards comparisons, project case studies and buyer guides on pressure piping components, flanges and forged fittings.
Found us via Google? Get an ASTM/ASME pipe-fittings quote in 4 hours.
Send RFQ189 articles
Buyer guideHow international buyers should review a Mill Test Certificate before approving shipment, including EN 10204 3.1 vs 3.2 differences and red flags.
StandardsWhat every EPC buyer should know about ASME B16.34: pressure classes, material groups, derating with temperature and procurement specification points.
TechnicalCompare ASTM A350 LF2, LF3 and LF6 forged flanges by impact test temperature, chemistry and best-fit service for cold and cryogenic piping projects.
Case studiesAramco's MGS-3 expansion adds roughly 4,000 km of large-bore gas transport pipeline plus 17 new compression trains. Here is the public sourcing picture.
Buyer guideA field-by-field RFQ template for international buyers sourcing pipe fittings from China, covering grade, end prep, NDE, MTC, and Incoterms.
StandardsProcurement guide comparing ASME B16.5, B16.47 Series A (ex-MSS SP-44) and Series B (ex-API 605) large diameter flanges with size and pressure ranges.
TechnicalA buyer's guide to ASTM A105 forged carbon steel flange chemistry limits, Brinell hardness ceiling, manganese-carbon trade-off and heat treatment options.
Case studiesPublicly reported industry reference case. India's east-coast LNG gap-filler shows why the connecting trunk-pipeline scope, not the tanks, is often the critical path of LNG-import projects.
Case studiesIndustry reference case based on EPC contractor public announcements. The world's largest single LNG buildout sets a multi-year procurement pipeline for cryogenic 9% Ni and stainless steel fittings.